▼狹長空間兩側(cè)的鏡面墻壁 Mirror walls on both sides of the narrow space
加建二層后受層高限制,機電設(shè)備及管線的布局尤為重要,項目設(shè)計階段將所有設(shè)備及管線都在模型中定位,健身房設(shè)計施工過程中也嚴格按照設(shè)計施工,最終保證使用中較高的使用高度。
After the second floor is added, the layout of mechanical and electrical equipment and pipelines is particularly important. All equipment and pipelines are positioned in the model during the design step of the project, and the construction is strictly in accordance with the design during the construction process, to ensure higher use in use height.
▼ 隱蔽的更衣區(qū)Hidden dressing area
▼ 前臺鋼板與金屬網(wǎng)的細節(jié) Details of reception steel plate and metal mesh
▼ 樓梯及鋼結(jié)構(gòu)細節(jié) Details of staircase and steel structure
▼ 一層平面圖 Ground floor plan
▼ 二層平面圖 Second floor plan
更多健身房設(shè)計資訊請關(guān)注聚設(shè)匯裝修平臺:
掃描二維碼關(guān)注我們的微信